Cargando…

Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland

This article analyses the architecture that was used in the temporary AmberExpo hospital in Gdańsk, Poland which was installed during the COVID-19 pandemic. The construction of this type of facility is often based on experimental approaches, aimed at caring for patients suffering from an infectious...

Descripción completa

Detalles Bibliográficos
Autores principales: Gebczynska-Janowicz, Agnieszka, Janowicz, Rafal, Targowski, Wojciech, Cudnik, Rafal, Paszko, Krystyna, Zielinska-Dabkowska, Karolina M.
Formato: Online Artículo Texto
Lenguaje:English
Publicado: MDPI 2022
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9819390/
https://www.ncbi.nlm.nih.gov/pubmed/36612960
http://dx.doi.org/10.3390/ijerph20010639
_version_ 1784865215824789504
author Gebczynska-Janowicz, Agnieszka
Janowicz, Rafal
Targowski, Wojciech
Cudnik, Rafal
Paszko, Krystyna
Zielinska-Dabkowska, Karolina M.
author_facet Gebczynska-Janowicz, Agnieszka
Janowicz, Rafal
Targowski, Wojciech
Cudnik, Rafal
Paszko, Krystyna
Zielinska-Dabkowska, Karolina M.
author_sort Gebczynska-Janowicz, Agnieszka
collection PubMed
description This article analyses the architecture that was used in the temporary AmberExpo hospital in Gdańsk, Poland which was installed during the COVID-19 pandemic. The construction of this type of facility is often based on experimental approaches, aimed at caring for patients suffering from an infectious disease in emergency conditions. In order to assess the level of employee satisfaction with the architectural and technical elements used in the first period of the hospital’s activity, medical staff were asked to fill out a questionnaire. The analysis of the survey’s results indicated that the majority of employees expressed satisfaction with the architectural and technical elements, with the design of the spatial layout of the individual medical zones receiving the most positive feedback. However, frequently selected drawbacks in the design included the lack of natural daylight, the artificial light that was used and the acoustics of the facility. This detailed examination of the satisfaction and feedback from medical employees working in this type of emergency facility enables the development of solutions that in the future will allow for the improved adaptive reuse and implementation of such structures, with enhanced time and economic efficiency, and most importantly, the ability to provide a safer workplace.
format Online
Article
Text
id pubmed-9819390
institution National Center for Biotechnology Information
language English
publishDate 2022
publisher MDPI
record_format MEDLINE/PubMed
spelling pubmed-98193902023-01-07 Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland Gebczynska-Janowicz, Agnieszka Janowicz, Rafal Targowski, Wojciech Cudnik, Rafal Paszko, Krystyna Zielinska-Dabkowska, Karolina M. Int J Environ Res Public Health Article This article analyses the architecture that was used in the temporary AmberExpo hospital in Gdańsk, Poland which was installed during the COVID-19 pandemic. The construction of this type of facility is often based on experimental approaches, aimed at caring for patients suffering from an infectious disease in emergency conditions. In order to assess the level of employee satisfaction with the architectural and technical elements used in the first period of the hospital’s activity, medical staff were asked to fill out a questionnaire. The analysis of the survey’s results indicated that the majority of employees expressed satisfaction with the architectural and technical elements, with the design of the spatial layout of the individual medical zones receiving the most positive feedback. However, frequently selected drawbacks in the design included the lack of natural daylight, the artificial light that was used and the acoustics of the facility. This detailed examination of the satisfaction and feedback from medical employees working in this type of emergency facility enables the development of solutions that in the future will allow for the improved adaptive reuse and implementation of such structures, with enhanced time and economic efficiency, and most importantly, the ability to provide a safer workplace. MDPI 2022-12-30 /pmc/articles/PMC9819390/ /pubmed/36612960 http://dx.doi.org/10.3390/ijerph20010639 Text en © 2022 by the authors. https://creativecommons.org/licenses/by/4.0/Licensee MDPI, Basel, Switzerland. This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license (https://creativecommons.org/licenses/by/4.0/).
spellingShingle Article
Gebczynska-Janowicz, Agnieszka
Janowicz, Rafal
Targowski, Wojciech
Cudnik, Rafal
Paszko, Krystyna
Zielinska-Dabkowska, Karolina M.
Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland
title Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland
title_full Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland
title_fullStr Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland
title_full_unstemmed Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland
title_short Evaluation of Medical Staff Satisfaction for Workplace Architecture in Temporary COVID-19 Hospital: A Case Study in Gdańsk, Poland
title_sort evaluation of medical staff satisfaction for workplace architecture in temporary covid-19 hospital: a case study in gdańsk, poland
topic Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9819390/
https://www.ncbi.nlm.nih.gov/pubmed/36612960
http://dx.doi.org/10.3390/ijerph20010639
work_keys_str_mv AT gebczynskajanowiczagnieszka evaluationofmedicalstaffsatisfactionforworkplacearchitectureintemporarycovid19hospitalacasestudyingdanskpoland
AT janowiczrafal evaluationofmedicalstaffsatisfactionforworkplacearchitectureintemporarycovid19hospitalacasestudyingdanskpoland
AT targowskiwojciech evaluationofmedicalstaffsatisfactionforworkplacearchitectureintemporarycovid19hospitalacasestudyingdanskpoland
AT cudnikrafal evaluationofmedicalstaffsatisfactionforworkplacearchitectureintemporarycovid19hospitalacasestudyingdanskpoland
AT paszkokrystyna evaluationofmedicalstaffsatisfactionforworkplacearchitectureintemporarycovid19hospitalacasestudyingdanskpoland
AT zielinskadabkowskakarolinam evaluationofmedicalstaffsatisfactionforworkplacearchitectureintemporarycovid19hospitalacasestudyingdanskpoland