Activity networks determine project performance
Projects are characterised by activity networks with a critical path, a sequence of activities from start to end, that must be finished on time to complete the project on time. Watching over the critical path is the project manager’s strategy to ensure timely project completion. This intense focus o...
Autores principales: | Vazquez, Alexei, Pozzana, Iacopo, Kalogridis, Georgios, Ellinas, Christos |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9831992/ https://www.ncbi.nlm.nih.gov/pubmed/36627400 http://dx.doi.org/10.1038/s41598-022-27180-0 |
Ejemplares similares
-
Modelling indirect interactions during failure spreading in a project activity network
por: Ellinas, Christos
Publicado: (2018) -
Epidemic spreading on activity-driven networks with attractiveness
por: Pozzana, Iacopo, et al.
Publicado: (2017) -
How Robust Is Your Project? From Local Failures to Global Catastrophes: A Complex Networks Approach to Project Systemic Risk
por: Ellinas, Christos, et al.
Publicado: (2015) -
WDM Systems and Networks: Modeling, Simulation, Design and Engineering
por: Antoniades, Neophytos, et al.
Publicado: (2012) -
Fiber-wireless convergence in next-generation communication networks: systems, architectures, and management
por: Tornatore, Massimo, et al.
Publicado: (2017)