Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan
Run off river schemes are getting widespread importance as they are considered environmentally safe. However, number of studies and the consequent information regarding impacts of run off river schemes is very limited worldwide. Present study attempted to analyze impacts of Ghazi Barotha Hydropower...
Autores principales: | , , , , , |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9840235/ https://www.ncbi.nlm.nih.gov/pubmed/36647356 http://dx.doi.org/10.1016/j.heliyon.2022.e12659 |
_version_ | 1784869599831916544 |
---|---|
author | Inam Ullah, Ehsan Ahmad, Shakil Khokhar, Muhammad Fahim Azmat, Muhammad Khayyam, Umer Qaiser, Faizan ur Rehman |
author_facet | Inam Ullah, Ehsan Ahmad, Shakil Khokhar, Muhammad Fahim Azmat, Muhammad Khayyam, Umer Qaiser, Faizan ur Rehman |
author_sort | Inam Ullah, Ehsan |
collection | PubMed |
description | Run off river schemes are getting widespread importance as they are considered environmentally safe. However, number of studies and the consequent information regarding impacts of run off river schemes is very limited worldwide. Present study attempted to analyze impacts of Ghazi Barotha Hydropower Plant, which is a run off river scheme situated in Khyber Pakhtunkhwa province of Pakistan. This study attempted to analyze impacts of this run off river scheme on hydrological and ecological conditions of downstream areas. Data on river discharge, groundwater levels, agriculture area, vegetation and bare soil was utilized for this study. All data sets between the year 1990 till 2020 were analyzed. Hydrological impacts were analyzed through secondary data analysis, whereas ecological impacts were studied through remote sensing technique. Statistical methods were applied to further draw conclusions between hydrological and ecological interrelationships. Results showed that after functioning of Ghazi Barotha, there was 47% and 91% reduction of river discharge, in summer and winter seasons respectively. Groundwater level dropped by 50%. Agriculture area reduced by 1.69% and 9.11% during summer and winter respectively, whereas land under bare soil increased. River water diversion was considered to be responsible for groundwater reduction, as strong correlation was found between both. Agriculture land recovery, in post Ghazi Barotha period, was premised at intense groundwater mining, as groundwater level and agriculture area were significantly related (p < 0.05). Governments’ groundwater development schemes, and a shift into motorized groundwater mining were major factors behind further groundwater exploitation in study area. This study came to the conclusion that Ghazi Barotha Hydropower Plant had impacted flow regime of Indus River, as well as groundwater levels and land use of downstream area along the river. These effects were triggered by inappropriate compensatory measures and uncontrolled water resource exploitation. |
format | Online Article Text |
id | pubmed-9840235 |
institution | National Center for Biotechnology Information |
language | English |
publishDate | 2023 |
publisher | Elsevier |
record_format | MEDLINE/PubMed |
spelling | pubmed-98402352023-01-15 Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan Inam Ullah, Ehsan Ahmad, Shakil Khokhar, Muhammad Fahim Azmat, Muhammad Khayyam, Umer Qaiser, Faizan ur Rehman Heliyon Research Article Run off river schemes are getting widespread importance as they are considered environmentally safe. However, number of studies and the consequent information regarding impacts of run off river schemes is very limited worldwide. Present study attempted to analyze impacts of Ghazi Barotha Hydropower Plant, which is a run off river scheme situated in Khyber Pakhtunkhwa province of Pakistan. This study attempted to analyze impacts of this run off river scheme on hydrological and ecological conditions of downstream areas. Data on river discharge, groundwater levels, agriculture area, vegetation and bare soil was utilized for this study. All data sets between the year 1990 till 2020 were analyzed. Hydrological impacts were analyzed through secondary data analysis, whereas ecological impacts were studied through remote sensing technique. Statistical methods were applied to further draw conclusions between hydrological and ecological interrelationships. Results showed that after functioning of Ghazi Barotha, there was 47% and 91% reduction of river discharge, in summer and winter seasons respectively. Groundwater level dropped by 50%. Agriculture area reduced by 1.69% and 9.11% during summer and winter respectively, whereas land under bare soil increased. River water diversion was considered to be responsible for groundwater reduction, as strong correlation was found between both. Agriculture land recovery, in post Ghazi Barotha period, was premised at intense groundwater mining, as groundwater level and agriculture area were significantly related (p < 0.05). Governments’ groundwater development schemes, and a shift into motorized groundwater mining were major factors behind further groundwater exploitation in study area. This study came to the conclusion that Ghazi Barotha Hydropower Plant had impacted flow regime of Indus River, as well as groundwater levels and land use of downstream area along the river. These effects were triggered by inappropriate compensatory measures and uncontrolled water resource exploitation. Elsevier 2023-01-07 /pmc/articles/PMC9840235/ /pubmed/36647356 http://dx.doi.org/10.1016/j.heliyon.2022.e12659 Text en © 2023 The Authors https://creativecommons.org/licenses/by-nc-nd/4.0/This is an open access article under the CC BY-NC-ND license (http://creativecommons.org/licenses/by-nc-nd/4.0/). |
spellingShingle | Research Article Inam Ullah, Ehsan Ahmad, Shakil Khokhar, Muhammad Fahim Azmat, Muhammad Khayyam, Umer Qaiser, Faizan ur Rehman Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan |
title | Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan |
title_full | Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan |
title_fullStr | Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan |
title_full_unstemmed | Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan |
title_short | Hydrological and ecological impacts of run off river scheme; a case study of Ghazi Barotha hydropower project on Indus River, Pakistan |
title_sort | hydrological and ecological impacts of run off river scheme; a case study of ghazi barotha hydropower project on indus river, pakistan |
topic | Research Article |
url | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9840235/ https://www.ncbi.nlm.nih.gov/pubmed/36647356 http://dx.doi.org/10.1016/j.heliyon.2022.e12659 |
work_keys_str_mv | AT inamullahehsan hydrologicalandecologicalimpactsofrunoffriverschemeacasestudyofghazibarothahydropowerprojectonindusriverpakistan AT ahmadshakil hydrologicalandecologicalimpactsofrunoffriverschemeacasestudyofghazibarothahydropowerprojectonindusriverpakistan AT khokharmuhammadfahim hydrologicalandecologicalimpactsofrunoffriverschemeacasestudyofghazibarothahydropowerprojectonindusriverpakistan AT azmatmuhammad hydrologicalandecologicalimpactsofrunoffriverschemeacasestudyofghazibarothahydropowerprojectonindusriverpakistan AT khayyamumer hydrologicalandecologicalimpactsofrunoffriverschemeacasestudyofghazibarothahydropowerprojectonindusriverpakistan AT qaiserfaizanurrehman hydrologicalandecologicalimpactsofrunoffriverschemeacasestudyofghazibarothahydropowerprojectonindusriverpakistan |