Cargando…

A study on optimization of delayed production mode of iron and steel enterprises based on data mining

Delayed production mode has been adopted by an increasing number of process production enterprises as a method to realize mass customization of multi-products. This paper used the convolutional neural network-long short-term memory artificial neural network algorithm (C-LSTM) in data mining technolo...

Descripción completa

Detalles Bibliográficos
Autores principales: Shi, Zhiming, Li, Yisong, Lu, Changxiang
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Public Library of Science 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9847961/
https://www.ncbi.nlm.nih.gov/pubmed/36652458
http://dx.doi.org/10.1371/journal.pone.0278750
_version_ 1784871592277311488
author Shi, Zhiming
Li, Yisong
Lu, Changxiang
author_facet Shi, Zhiming
Li, Yisong
Lu, Changxiang
author_sort Shi, Zhiming
collection PubMed
description Delayed production mode has been adopted by an increasing number of process production enterprises as a method to realize mass customization of multi-products. This paper used the convolutional neural network-long short-term memory artificial neural network algorithm (C-LSTM) in data mining technology to analyze and determine factors that have an impact on delayed production mode in the internal and external production and operation of enterprises. Combined with the actual production situation of iron and steel enterprises, a quantitative model of the delayed production was constructed. Lastly, data from a large iron and steel enterprise with good operation was used to verify the validity of the proposed model and analyze key influencing factors. According to the research, in scenarios of considering PDP alone, considering CODP alone, considering both PDP and CODP, considering PDP and CODP and using data mining technology to model, the matching degree of these methods with the actual situation of the enterprise is 31.8%, 61.4%, 71.6% and 86.6%, respectively. The numerical analysis results of the model based on data mining technology show that in delayed production, when customer service level improves or the delay penalty coefficient increases, the optimal locations of the product differentiation point (PDP) and customer order decoupling point (CODP) move toward the end of production, and the total cost increases gradually. When the difference in production cost or benefit of early delivery between the candidate locations of PDP and CODP is small, optimal locations of PDP and CODP are close to the beginning of the general and dedicated production processes. With an increase of cost difference or early delivery benefit, the optimal locations of PDP and CODP jumped to the end stage of the general and dedicated production processes, and the total cost begins to decrease.
format Online
Article
Text
id pubmed-9847961
institution National Center for Biotechnology Information
language English
publishDate 2023
publisher Public Library of Science
record_format MEDLINE/PubMed
spelling pubmed-98479612023-01-19 A study on optimization of delayed production mode of iron and steel enterprises based on data mining Shi, Zhiming Li, Yisong Lu, Changxiang PLoS One Research Article Delayed production mode has been adopted by an increasing number of process production enterprises as a method to realize mass customization of multi-products. This paper used the convolutional neural network-long short-term memory artificial neural network algorithm (C-LSTM) in data mining technology to analyze and determine factors that have an impact on delayed production mode in the internal and external production and operation of enterprises. Combined with the actual production situation of iron and steel enterprises, a quantitative model of the delayed production was constructed. Lastly, data from a large iron and steel enterprise with good operation was used to verify the validity of the proposed model and analyze key influencing factors. According to the research, in scenarios of considering PDP alone, considering CODP alone, considering both PDP and CODP, considering PDP and CODP and using data mining technology to model, the matching degree of these methods with the actual situation of the enterprise is 31.8%, 61.4%, 71.6% and 86.6%, respectively. The numerical analysis results of the model based on data mining technology show that in delayed production, when customer service level improves or the delay penalty coefficient increases, the optimal locations of the product differentiation point (PDP) and customer order decoupling point (CODP) move toward the end of production, and the total cost increases gradually. When the difference in production cost or benefit of early delivery between the candidate locations of PDP and CODP is small, optimal locations of PDP and CODP are close to the beginning of the general and dedicated production processes. With an increase of cost difference or early delivery benefit, the optimal locations of PDP and CODP jumped to the end stage of the general and dedicated production processes, and the total cost begins to decrease. Public Library of Science 2023-01-18 /pmc/articles/PMC9847961/ /pubmed/36652458 http://dx.doi.org/10.1371/journal.pone.0278750 Text en © 2023 Shi et al https://creativecommons.org/licenses/by/4.0/This is an open access article distributed under the terms of the Creative Commons Attribution License (https://creativecommons.org/licenses/by/4.0/) , which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
spellingShingle Research Article
Shi, Zhiming
Li, Yisong
Lu, Changxiang
A study on optimization of delayed production mode of iron and steel enterprises based on data mining
title A study on optimization of delayed production mode of iron and steel enterprises based on data mining
title_full A study on optimization of delayed production mode of iron and steel enterprises based on data mining
title_fullStr A study on optimization of delayed production mode of iron and steel enterprises based on data mining
title_full_unstemmed A study on optimization of delayed production mode of iron and steel enterprises based on data mining
title_short A study on optimization of delayed production mode of iron and steel enterprises based on data mining
title_sort study on optimization of delayed production mode of iron and steel enterprises based on data mining
topic Research Article
url https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9847961/
https://www.ncbi.nlm.nih.gov/pubmed/36652458
http://dx.doi.org/10.1371/journal.pone.0278750
work_keys_str_mv AT shizhiming astudyonoptimizationofdelayedproductionmodeofironandsteelenterprisesbasedondatamining
AT liyisong astudyonoptimizationofdelayedproductionmodeofironandsteelenterprisesbasedondatamining
AT luchangxiang astudyonoptimizationofdelayedproductionmodeofironandsteelenterprisesbasedondatamining
AT shizhiming studyonoptimizationofdelayedproductionmodeofironandsteelenterprisesbasedondatamining
AT liyisong studyonoptimizationofdelayedproductionmodeofironandsteelenterprisesbasedondatamining
AT luchangxiang studyonoptimizationofdelayedproductionmodeofironandsteelenterprisesbasedondatamining