Cargando…
Critical delay factors for construction projects in Central Aceh District, Indonesia
Background: Construction development in Indonesia is growing rapidly, especially in Central Aceh District. Construction projects often experience risks, so that risk events can have a serious impact on the viability of the project. Project delays can result in cost overruns and project losses. There...
Autores principales: | Rauzana, Anita, Zahrah, Aghnia, Dharma, Wira |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
F1000 Research Limited
2022
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9860196/ https://www.ncbi.nlm.nih.gov/pubmed/36704049 http://dx.doi.org/10.12688/f1000research.110024.3 |
Ejemplares similares
-
Causes of delays in construction projects in the Province of Aceh, Indonesia
por: Rauzana, Anita, et al.
Publicado: (2022) -
The Analysis of Health Index Development Factor in Aceh Province, Indonesia
por: Ramli, Nurlaili, et al.
Publicado: (2019) -
Factors influencing mother’s participation in Posyandu for improving nutritional status of children under-five in Aceh Utara district, Aceh province, Indonesia
por: Nazri, Cut, et al.
Publicado: (2016) -
Cross-sectional survey of malaria prevalence in tsunami-affected districts of Aceh Province, Indonesia
por: Muriuki, David, et al.
Publicado: (2012) -
An analysis of physical vulnerability to flash floods in the small mountainous watershed of Aceh Besar Regency, Aceh province, Indonesia
por: Azmeri, Azmeri, et al.
Publicado: (2018)