Cargando…
Building projects with time–cost–quality–environment trade-off optimization using adaptive selection slime mold algorithm
Every project manager deals with various challenges, and almost all tasks have backup plans to ensure efficient success. Therefore, it is essential to manage resources, notably in terms of time, cost, quality, and environmental impact, and this needs to be thoroughly shown. As a result, the adaptive...
Autores principales: | Son, Pham Vu Hong, Khoi, Luu Ngoc Quynh |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Springer International Publishing
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9869322/ http://dx.doi.org/10.1007/s42107-023-00572-x |
Ejemplares similares
-
Utilizing artificial intelligence to solving time – cost – quality trade-off problem
por: Son, Pham Vu Hong, et al.
Publicado: (2022) -
GALVANOTAXIS OF SLIME MOLD
por: Anderson, John D.
Publicado: (1951) -
Self-starting slime mold
por: Leslie, Mitch
Publicado: (2007) -
Potassium Loss during Galvanotaxis of Slime Mold
por: Anderson, John D.
Publicado: (1962) -
Mitosis in the cellular slime mold Polysphondylium violaceum
Publicado: (1975)