Cargando…

Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model

The analysis of the relationship between time and cost is a crucial aspect of construction project management. Various optimization techniques have been developed to solve time–cost trade-off problems. A hybrid multi-verse optimizer model (hDMVO) is introduced in this study, which combines the multi...

Descripción completa

Detalles Bibliográficos
Autores principales: Son, Pham Vu Hong, Nguyen Dang, Nghiep Trinh
Formato: Online Artículo Texto
Lenguaje:English
Publicado: Nature Publishing Group UK 2023
Materias:
Acceso en línea:https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9898292/
https://www.ncbi.nlm.nih.gov/pubmed/36737486
http://dx.doi.org/10.1038/s41598-023-29050-9

Ejemplares similares