Cargando…
Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model
The analysis of the relationship between time and cost is a crucial aspect of construction project management. Various optimization techniques have been developed to solve time–cost trade-off problems. A hybrid multi-verse optimizer model (hDMVO) is introduced in this study, which combines the multi...
Autores principales: | Son, Pham Vu Hong, Nguyen Dang, Nghiep Trinh |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Nature Publishing Group UK
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9898292/ https://www.ncbi.nlm.nih.gov/pubmed/36737486 http://dx.doi.org/10.1038/s41598-023-29050-9 |
Ejemplares similares
-
Utilizing artificial intelligence to solving time – cost – quality trade-off problem
por: Son, Pham Vu Hong, et al.
Publicado: (2022) -
A New Model for Solving Time-Cost-Quality Trade-Off Problems in Construction
por: Fu, Fang, et al.
Publicado: (2016) -
Multiple objective immune wolf colony algorithm for solving time-cost-quality trade-off problem
por: Liu, Guanyi, et al.
Publicado: (2023) -
2000 solved problems in discrete mathematics
por: Lipschutz, Seymour
Publicado: (1992) -
An Efficient Method for Solving Router Placement Problem in Wireless Mesh Networks Using Multi-Verse Optimizer Algorithm
por: Binh, Le Huu, et al.
Publicado: (2022)