Facility planning and schedule design in the pandemic: Eliminating contacts at construction workplace
The construction industry has been severely affected by the COVID-19 pandemic and the associated restrictions on person-to-person contacts issued by the government. A construction site usually has a high number of workers working at the same time; therefore, the question of how to ensure their safet...
Autores principales: | Wang, Haoqing, Yi, Wen, Wang, Shuaian |
---|---|
Formato: | Online Artículo Texto |
Lenguaje: | English |
Publicado: |
Elsevier Ltd.
2023
|
Materias: | |
Acceso en línea: | https://www.ncbi.nlm.nih.gov/pmc/articles/PMC9911307/ https://www.ncbi.nlm.nih.gov/pubmed/36789403 http://dx.doi.org/10.1016/j.jclepro.2023.136394 |
Ejemplares similares
-
Project planning, scheduling, and control in construction : an encyclopedia of terms and applications
por: Popescu, Calin M.
Publicado: (1995) -
Design and scheduling problems in planning optical networks
por: Maurer, Olaf
Publicado: (2016) -
Construction schedule
por: CERN. Geneva. SPS Experiments Committee
Publicado: (1974) -
Port planning design and construction
Publicado: (1973) -
Construction drawings - bar scheduling
por: International Organization for Standardization. Geneva
Publicado: (1994)