Mostrando 5,181 - 5,200 Resultados de 2,754,589 Para Buscar '"3 %"', tiempo de consulta: 3.49s Limitar resultados
  1. 5181
  2. 5182
  3. 5183
  4. 5184
  5. 5185
  6. 5186
    por Geschonke, Günther, Ghigo, A
    Publicado 2002
    “…The design of CLIC is based on a two-beam scheme, where short pulses of high power 30 GHz RF are extracted from a drive beam running parallel to the main beam. The 3rd generation CLIC Test Facility (CTF3) will demonstrate the generation of the drive beam with the appropriate time structure, the extraction of 30 GHz RF power from this beam, as well as acceleration of a probe beam with 30 GHz RF cavities The project makes maximum use of existing equipment and infrastructure of the LPI complex, which became available after the closure of LEP.…”
    Enlace del recurso
  7. 5187
    “…The Preliminary Phase of the new CLIC Test Facility CTF3 consists of a low-charge demonstration of the electron bunch train combination process on which the CLIC drive beam generation scheme is based. …”
    Enlace del recurso
  8. 5188
  9. 5189
    por Ladron De Guevara, P
    Publicado 2002
    “…%RE4 %title\\ \\The L3+C experiment takes advantage of the unique properties of the L3 muon spectrometer to get an accurate measurement of cosmic ray muons 30 m underground. …”
    Enlace del recurso
  10. 5190
    “…We measure the static three-quark potential in SU(3) lattice gauge theory with improved accuracy, by using all available technical refinements, including Luscher-Weisz exponential variance reduction. …”
    Enlace del recurso
    Enlace del recurso
  11. 5191
    por Corsini, R
    Publicado 2002
    “…CTF3 will also constitute a 30 GHz source with the CLIC nominal peak power and pulse length, for RF component testing. …”
    Enlace del recurso
  12. 5192
  13. 5193
  14. 5194
  15. 5195
  16. 5196
  17. 5197
  18. 5198
  19. 5199
  20. 5200
Herramientas de búsqueda: RSS