Mostrando 1 - 20 Resultados de 116 Para Buscar '"Due Date"', tiempo de consulta: 1.93s Limitar resultados
  1. 1
    por Yin, Yunqiang, Wang, Dujuan, Cheng, T C E
    Publicado 2020
    “…This book provides an introduction to the models, methods, and results of some due date-related scheduling problems in the field of multiagent scheduling. …”
    Enlace del recurso
    Enlace del recurso
  2. 2
    por Wan, Long
    Publicado 2014
    “…We investigate a common due-date assignment scheduling problem with a variable maintenance on a single machine. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  3. 3
    “…The objective functions include total earliness, the weighted number of tardy jobs, and the cost of due date assignment. We analyze these problems with two different due date assignment methods. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  4. 4
    “…To our knowledge, this paper investigates the first application of meta-heuristic algorithms to tackle the parallel machines scheduling problem with weighted late work criterion and common due date ([Formula: see text] ). Late work criterion is one of the performance measures of scheduling problems which considers the length of late parts of particular jobs when evaluating the quality of scheduling. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  5. 5
    “…However, less is known about infants born after their due date and over a quarter of infants are born over 1 week late, and many still remain undelivered after 2 weeks. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  6. 6
    “…This paper deals with a problem of minimizing total weighted tardiness of jobs in a real-world single batch-processing machine (SBPM) scheduling in the presence of fuzzy due date. In this paper, first a fuzzy mixed integer linear programming model is developed. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  7. 7
    “…This project aimed to improve timely completion of baseline (within 72 hours of admission) and monitoring (within one week of due date) bloods and ECGS. METHOD: This project was completed within a 12-bed child and adolescent inpatient unit. …”
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  8. 8
    “…The constraints include the capacity restriction on the service arcs, flow balance constraints, transportation due date constraints and logical relationship constraints among the decision variables. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  9. 9
  10. 10
    por Odd, David, Evans, David, Emond, Alan
    Publicado 2016
    “…BACKGROUND: Preterm infants are often enrolled in school a year earlier than would be expected if this decision is based on their actual date of birth rather than their due date. Initially these infants appear to do disproportionately worse than those who do not ‘skip’ a year. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  11. 11
    “…Secondary outcomes were withdrawing from follow-up after contact and time from assessment due date to completion.  Analyses were conducted using logistic or Cox Proportional Hazards regression as appropriate. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  12. 12
    por Smith, Mike, Abbas, Mustafa
    Publicado 2021
    “…A tool was created that automatically calculated the next due date for each check and colour coded which were overdue (red) or within 30 days of the due date (yellow). …”
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  13. 13
    “…They were designed for display in the home and included the due date of the next immunisation, a photo of the child and Aboriginal artwork. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  14. 14
    “…Materials and Methods: Wyoming Medicaid contracted with Xerox State Healthcare to launch WYhealth Due Date Plus, a pregnancy application by Wildflower Health. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  15. 15
    “…BACKGROUND: While life-long impacts exist for infants born one or two weeks early little evidence exists for those infants born after their due date. However interventions could be used to expedite birth if the risks of continuing the pregnancy are higher than intervening. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  16. 16
    “…The RHIS update in 2008 increased the number of reporting items and extended the submission due date since 2009 while computerized 15 health centers since 2011. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  17. 17
    por Gajpal, Yuvraj, Roy, Vivek, Sahay, B.S.
    Publicado 2019
    “…The resultant problem is identified as a vehicle routing problem with a common due date (VRPCDD). We provide a formulation for the VRPCDD and thereby focus on suggesting solution methods. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  18. 18
    “…IMPLICATIONS OF THE HYPOTHESIS: Support for our hypothesis would require revision of obstetric interventions routinely performed when a human pregnancy extends beyond the due date.…”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  19. 19
    “…Tardiness is to measure the due date performance, which has a direct impact on cost for executing the jobs. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
  20. 20
    “…In this study, we propose deep reinforcement learning to provide truck routes of a given container transport order by considering several significant factors such as order origin, destination, time window, and due date. To assess its performance, we compared between the proposed method and two approaches that are used to solve truck routing problems. …”
    Enlace del recurso
    Enlace del recurso
    Enlace del recurso
    Online Artículo Texto
Herramientas de búsqueda: RSS