Mostrando 321 - 340 Resultados de 1,858 Para Buscar '"KEK"', tiempo de consulta: 0.25s Limitar resultados
  1. 321
    “…A cryogenic system for the test facility of high gradient superconducting quadrupole magnets for the Large Hadron Collider (LHC) at CERN has been constructed at KEK. It consists of a vertical double-bath cryostat in He II at an atmospheric pressure, a vacuum pumping system and a pair of refrigerator/liquefiers to maximize the cooling capacity to test 6.3 m long magnets. …”
    Enlace del recurso
    Enlace del recurso
  2. 322
  3. 323
  4. 324
    “…The ATF2 beam line at KEK was built to validate the operating principle of a novel final-focus scheme devised to demagnify high-energy beams in future linear lepton colliders; to date vertical beam sizes as small as 41 nm have been demonstrated. …”
    Enlace del recurso
    Enlace del recurso
  5. 325
  6. 326
  7. 327
  8. 328
  9. 329
  10. 330
  11. 331
  12. 332
  13. 333
  14. 334
  15. 335
  16. 336
  17. 337
  18. 338
  19. 339
  20. 340
Herramientas de búsqueda: RSS