Mostrando 1,741 - 1,760 Resultados de 216,525 Para Buscar '"This Is the End"', tiempo de consulta: 0.56s Limitar resultados
  1. 1741
    por Carrio Argos, Fernando
    Publicado 2016
    “…ATLAS Calorimeters Back-end Electronics at HL-LHC (ACES workshop, CERN, March 7-10th, 2016)…”
    Enlace del recurso
  2. 1742
  3. 1743
  4. 1744
  5. 1745
  6. 1746
  7. 1747
  8. 1748
    por Cassina, L.
    Publicado 2016
    “…The measured performance of several tubes is reported, together with their long-term stability. A new 8-channel front-end chip, named CLARO, has been designed in 0.35 µm CMOS AMS technology for the MaPMT readout. …”
    Enlace del recurso
    Enlace del recurso
  9. 1749
    por Chen, Xin
    Publicado 2016
    “…The talk discusses the expected status of Higgs physics at the end of Run III. The current status is briefly included, and the expected Higgs reach after HL-LHC are also summarized/presented for some channels.…”
    Enlace del recurso
  10. 1750
  11. 1751
    por Chen, Xin
    Publicado 2017
    “…The expected status of Higgs physics at the end of Run-3 is presented. The current Run-2 status is briefly reviewed, and the expected Higgs reach after the HL-LHC period is also summarized for some channels.…”
    Enlace del recurso
  12. 1752
  13. 1753
    “…The End-Of-Substructure Card (EoS) is the interface between the building block of the ITk Strip Tracker (staves and petals) and the outside world. …”
    Enlace del recurso
  14. 1754
  15. 1755
  16. 1756
  17. 1757
  18. 1758
    por Burger, Armin
    Publicado 2020
    “…It currently consists of the EOS system as storage back-end with a total gross capacity of 15.5 PB, and service nodes with a total of 2000 CPU cores. …”
    Enlace del recurso
  19. 1759
  20. 1760
Herramientas de búsqueda: RSS