Mostrando 181 - 200 Resultados de 16,611 Para Buscar '"Upgrade"', tiempo de consulta: 0.12s Limitar resultados
  1. 181
  2. 182
  3. 183
  4. 184
  5. 185
    por Rossi, Lucio
    Publicado 2013
    Enlace del recurso
    info:eu-repo/semantics/article
  6. 186
    por Schindler, H
    Publicado 2013
    “…The physics case and the strategy for the upgrade have been endorsed by the LHCC. This paper presents briefly the physics motivations for the LHCb upgrade and the proposed changes to the detector and trigger.…”
    Enlace del recurso
  7. 187
    por Rodríguez Pérez, Pablo
    Publicado 2013
    “…The current status of the VELO upgrade program will be described together with recent testbeam results.…”
    Enlace del recurso
    Enlace del recurso
  8. 188
  9. 189
  10. 190
  11. 191
  12. 192
  13. 193
    por Guz, Yu
    Publicado 2013
    “…The LHCb collaboration foresees a major detector upgrade around 2018. In order to be able to work at higher instantaneous luminosity (2 • 10$^{33}$ cm$^{-2}$s${-1}$), the LHCb data taking scheme will be changed to a full 40 MHz readout of all the subdetectors and software implemented trigger running at a large PC farm. …”
    Enlace del recurso
  14. 194
    por Kiryunin, A
    Publicado 2013
    “…Three phases of the upgrade of the ATLAS detector, as proposed by the collaboration, are presented in this talk.…”
    Enlace del recurso
  15. 195
    por Cardini, A
    Publicado 2013
    “…The upgrade will allow 40 MHz detector readout, and events will be selected by means of a very flexible software-based trigger. …”
    Enlace del recurso
  16. 196
  17. 197
  18. 198
    por Klein, Katja
    Publicado 2013
    “…However, the foreseen increases of both the instantaneous and the integrated luminosity by the LHC during the next ten years will necessitate a stepwise upgrade of the CMS tracking detector. \\ In the extended end-of-year shutdown 2016/17 the pixel detector will be exchanged. …”
    Enlace del recurso
  19. 199
  20. 200
    por Tricomi, Alessia
    Publicado 2013
    “…The design choices for the CMS pixel and outer tracker upgrades are discussed along with some highlights of the R\&D activities.…”
    Enlace del recurso
    Enlace del recurso
Herramientas de búsqueda: RSS