Mostrando 2,461 - 2,480 Resultados de 16,611 Para Buscar '"Upgrade"', tiempo de consulta: 0.27s Limitar resultados
  1. 2461
    “…The pixel-strip modules for the CMS Tracker Phase-2 Upgrade for the HL-LHC integrate a readout hybrid (PS-ROH) for the control and data acquisition link. …”
    Enlace del recurso
  2. 2462
  3. 2463
  4. 2464
  5. 2465
  6. 2466
  7. 2467
    por Moayedi, Seyedali
    Publicado 2020
    “…The timing, control and communication interface with the off-detector electronics is implemented with modern Field Programmable Gate Arrays (FPGAs) and high speed fibre optic links running up to 9.6 Gb/s. The TileCal upgrade program has included extensive R&D and test beam studies. …”
    Enlace del recurso
  8. 2468
    por Whalen, Kathleen
    Publicado 2020
    “…This talk will introduce the features of the upgraded L1Calo system and the plans for production, installation, and commissioning. …”
    Enlace del recurso
  9. 2469
    por Rabanal Bolaños, Gabriel
    Publicado 2020
    “…With the upgraded beam luminosity in LHC run-3, the detector technology for the innermost end-cap muon station (Small Wheel) of the ATLAS detector needs to be upgraded. …”
    Enlace del recurso
  10. 2470
    “…In preparation for Run3, when the LHC is expected to run at higher energy and instantaneous luminosity, L1Calo and LAr are implementing a significant upgrade programme, in order to better perform in a challenging high-luminosity and high-pileup environment. …”
    Enlace del recurso
  11. 2471
  12. 2472
    por Clement, Christophe
    Publicado 2020
    “…The main features of the TileCal upgrade program and results obtained from the Demonstrator tests will be discussed.…”
    Enlace del recurso
  13. 2473
    “…ATLAS detector at the Large Hadron Collider (LHC) will undergo a major Phase-II upgrade for the High Luminosity LHC (HL-LHC). The upgrade affects all major ATLAS systems, including the Trigger and Data Acquisition systems. …”
    Enlace del recurso
    Enlace del recurso
  14. 2474
    por Mino, Yuya
    Publicado 2020
    “…During the Phase-1 Upgrade for Run-3, new detectors will be installed to improve the trigger performance. …”
    Enlace del recurso
    Enlace del recurso
  15. 2475
    “…An extensive sensor testing campaign is presented, dedicated to measuring the charge collection properties of prototype candidates for the Vertex Locator (VELO) detector for the upgraded LHCb experiment. The charge collection is measured with sensors exposed to fluences of up to 8×1015 1 MeV neq cm-2, as well as with nonirradiated prototypes. …”
    Enlace del recurso
    Enlace del recurso
  16. 2476
    “…ATLAS detector at the Large Hadron Collider (LHC) will undergo a major Phase-II upgrade for the High Luminosity LHC (HL-LHC). The upgrade affects all major ATLAS systems, including the Trigger and Data Acquisition systems. …”
    Enlace del recurso
  17. 2477
    por Mino, Yuya
    Publicado 2020
    “…In order to cope with the high event rate, continuous upgrades of the ATLAS trigger system is mandatory. …”
    Enlace del recurso
  18. 2478
    “…ATLAS detector at the Large Hadron Collider (LHC) will undergo a major Phase-II upgrade for the High Luminosity LHC (HL-LHC). The upgrade affects all major ATLAS systems, including the Trigger and Data Acquisition systems. …”
    Enlace del recurso
  19. 2479
    “…The main features of the TileCal upgrade program and results obtained from the Demonstrator tests are discussed.…”
    Enlace del recurso
    Enlace del recurso
  20. 2480
    por Moayedi, Seyedali
    Publicado 2020
    “…The timing, control and communication interface with the off-detector electronics is implemented with modern Field Programmable Gate Arrays (FPGAs) and high speed fiber optic links running up to 9.6~Gbps. The TileCal upgrade program has included extensive R\&D and test beam studies. …”
    Enlace del recurso
    Enlace del recurso
Herramientas de búsqueda: RSS