Mostrando 3,081 - 3,100 Resultados de 16,611 Para Buscar '"Upgrade"', tiempo de consulta: 0.20s Limitar resultados
  1. 3081
  2. 3082
    por Karentzos, Efstathios
    Publicado 2021
    “…Both technologies are "aligned" to the ATLAS general baselines for the NSW upgrade project, maintaining in such way the excellent performance of the muon system beyond Run-3. …”
    Enlace del recurso
    Enlace del recurso
  3. 3083
    por Capocasa, Francesca
    Publicado 2021
    “…The ATLAS experiment is currently preparing for an upgrade of the inner tracking detector for High-Luminosity LHC operation, scheduled to start in 2027. …”
    Enlace del recurso
  4. 3084
  5. 3085
  6. 3086
    por Ramon Alvarez, Clara
    Publicado 2021
    “…In view of the HL-LHC, the Phase-2 CMS upgrade will replace the entire trigger and data acquisition system. …”
    Enlace del recurso
    Enlace del recurso
  7. 3087
    por De Bruyn, Isabelle Helena J
    Publicado 2019
    “…The High Luminosity LHC will present particular challenges to the electronics that read out the CSCs: the demands of increased particle flux, longer trigger latency, and increased trigger rate require upgraded electronics boards in the forward region. …”
    Enlace del recurso
  8. 3088
    por Eliseev, Dmitry
    Publicado 2019
    “…In the context of the increasing luminosity of the LHC, in preparation for Phase 2, the DT system is being upgraded. The main focus of this upgrade is the development of a new generation of read-out electronics based on FPGA technology. …”
    Enlace del recurso
  9. 3089
    por Tosi, Nicolo
    Publicado 2018
    “…The Beam Pickup Transformer (BPTX) provides instead a precise measurement of beam intensity and arrival time. An upgraded back-end electronics has been developed for the BCM1F, based on the modern uTCA standard which has been adopted by several other CMS sub-systems. …”
    Enlace del recurso
    Enlace del recurso
  10. 3090
  11. 3091
    “…The ATLAS experiment is currently upgrading the first muon station in the high-rapidity region with the construction of new detector structures, named New Small Wheels (NSW), based on large-size multi-gap resistive strips Micromegas technology and small-strip Thin Gap Chambers (sTGC). …”
    Enlace del recurso
  12. 3092
  13. 3093
    por Leone, Sandra
    Publicado 2022
    “…This presentation will summarize the expected performance of the upgraded detector and the new insights gained during the construction phase.…”
    Enlace del recurso
  14. 3094
  15. 3095
    por Leone, Sandra
    Publicado 2022
    “…This presentation will summarize the expected performance of the upgraded detector and the new insights gained during the construction phase.…”
    Enlace del recurso
  16. 3096
  17. 3097
  18. 3098
  19. 3099
  20. 3100
    por Wu, Mengqing
    Publicado 2022
    “…This has motivated a series of upgrades, to be installed during the long experimental shutdown from 2026 to 2029. …”
    Enlace del recurso
Herramientas de búsqueda: RSS