Mostrando 921 - 940 Resultados de 16,611 Para Buscar '"Upgrade"', tiempo de consulta: 0.19s Limitar resultados
  1. 921
    por Kushpil, Svetlana
    Publicado 2016
    “…Radiation hardness of the upgraded ITS is one of the crucial moments in the overall performance of the system. …”
    Enlace del recurso
    Enlace del recurso
  2. 922
    por Tobin, Mark
    Publicado 2016
    “…The LHCb detector will be upgraded during the Long Shutdown 2 (LS2) of the LHC in order to cope with higher instantaneous luminosities and to read out the data at 40 MHz using a trigger-less read-out system. …”
    Enlace del recurso
    Enlace del recurso
  3. 923
    por Cid Vidal, Xabier
    Publicado 2016
    “…These proceedings present the VELO upgrade and briefly discuss the results of the sensor testing campaign.…”
    Enlace del recurso
    Enlace del recurso
  4. 924
    por Riedler, P
    Publicado 2016
    “…This contribution will provide an overview of the upgrade of the ALICE ITS and the expected performance improvement and will present the actual status of the R&D;.…”
    Enlace del recurso
    Enlace del recurso
  5. 925
    por Naik, S
    Publicado 2017
    “…The upgraded Vertex Locator will be a hybrid pixel detector read out by the VeloPix ASIC with on-chip zero-suppression. …”
    Enlace del recurso
    Enlace del recurso
  6. 926
    por Garcia-Solis, Edmundo
    Publicado 2016
    “…The ALICE Collaboration is preparing a major detector upgrade for the second LHC long shutdown (2019–20). …”
    Enlace del recurso
    Enlace del recurso
  7. 927
    por Siddhanta, Sabyasachi
    Publicado 2017
    “…To exploit the new LHC capabilities, several existing detectors will undergo a substantial upgrade and new detectors will be added. Within this upgrade strategy, the Inner Tracking System (ITS) upgrade forms an important cornerstone, providing precise measurements for heavy-flavour interactions with the QGP medium and for the production of thermal photons and low-mass dileptons. …”
    Enlace del recurso
    Enlace del recurso
  8. 928
    por Ravasenga, Ivan
    Publicado 2017
    “…To fulfil the requirements of the ALICE physics program for Run 3, the ALICE experiment at LHC is planning a major upgrade during the Long Shutdown 2 of LHC in 2019-2020. …”
    Enlace del recurso
    Enlace del recurso
  9. 929
    por Karjavin, V Yu
    Publicado 2018
    “…The goals and objectives of the endcap muon system upgrade are formulated. The main results of works accomplished for the ME1/1 CSCs upgrade and the new ME4/2 muon station construction during the LHC Long Shutdown-1 (2013–2014) are presented. …”
    Enlace del recurso
    Enlace del recurso
  10. 930
  11. 931
  12. 932
  13. 933
    por Whitehead, Mark Peter
    Publicado 2018
    “…The LHCb upgrade will take place in preparation for data taking in LHC Run III. …”
    Enlace del recurso
    Enlace del recurso
  14. 934
    “…An upgrade of the LHC injection kickers is necessary for HL-LHC to avoid excessive beam induced heating of these magnets: the intensity of the HL-LHC beam will be twice that of LHC. …”
    Enlace del recurso
    Enlace del recurso
  15. 935
    “…The implications as well as possible mitigations and upgrade measures for the dilution system, such as decreasing the pulse-generator voltage, adding two additional kickers, and implementing a retrigger system, are discussed.…”
    Enlace del recurso
    Enlace del recurso
  16. 936
    “…The performance of the upgraded version of the LHCb ECAL monitoring system is also discussed.…”
    Enlace del recurso
    Enlace del recurso
  17. 937
    “…This article presents the recent (2017-2018) electronics modifications for the upgrade o the TOTEM roman pot detectors at the CERN LHC. …”
    Enlace del recurso
    Enlace del recurso
  18. 938
    “…The LHCb detector will be upgraded for the LHC Run 3. The new, full software trigger must be able to sustain the 30MHz proton-proton inelastic collision rate. …”
    Enlace del recurso
    Enlace del recurso
  19. 939
    por Münzer, Robert
    Publicado 2020
    “…The upgraded detector will operate continuously and trigger-less without the use of a gating grid. …”
    Enlace del recurso
    Enlace del recurso
  20. 940
Herramientas de búsqueda: RSS