Mostrando 12,901 - 12,920 Resultados de 16,611 Para Buscar '"Upgrade"', tiempo de consulta: 0.17s Limitar resultados
  1. 12901
    por Shiltsev, Vladimir
    Publicado 2007
    “…In this lecture series, we'll try to learn from the exciting story of the Tevatron Collider Run II: the story of long preparations, great expectations, initial difficulties, years of "blood and sweat", continuous upgrades, exceeding its goals, high emotions, tune-up of accelerator organization for "combat fighting". …”
    Enlace del recurso
  2. 12902
    por Tückmantel, J
    Publicado 2010
    “…In this context it was underlined that – apparently also not generally known – already the ultimate current in LHC requires serious upgrades of the (much less expensive) RF system’s low-level part. …”
    Enlace del recurso
  3. 12903
    por Hermanns, T
    Publicado 2011
    “…This note assesses the question, to which extent the steerer dipole of the LBE line LBE.DHZ/DVT10, originally foreseen for 50 MeV Linac2 proton operation, is capable of bending a higher-energetic future 160 MeV Linac4 H--beam without being upgraded. At first, the maximum bending angle has been experimentally determined from measurements with the Linac2 proton beam. …”
    Enlace del recurso
  4. 12904
    por Pozzobon, Nicola
    Publicado 2011
    “…The LHC machine is planned to be upgraded in the next decade in order to deliver a luminosity about 5 to 10 times larger than the design one of $10^{34}$ cm$^{-2}$s$^{-1}$. …”
    Enlace del recurso
  5. 12905
    por Nikiforou, N, Montejo Berlingen, J
    Publicado 2012
    “…The calibration and measurement stability of the calorimeters is also presented. Finally, hardware upgrades and replacements that will ensure efficient data taking through the 2012 data taking period are mentioned.…”
    Enlace del recurso
  6. 12906
    por Tanasijczuk, A J
    Publicado 2012
    “…This contribution will summarize the status and performance of the ATLAS tau trigger system during the 2011 data taking period, and the upgrades put in place for the current 2012 run. Special emphasis will be placed on the key role of identification and rejection capabilities of the different sub-detectors of ATLAS and the algorithms used. …”
    Enlace del recurso
  7. 12907
    por Tanasijczuk, A J
    Publicado 2012
    “…This contribution will summarize the status and performance of the ATLAS tau trigger system during the 2011 data taking period, and the upgrades put in place for the current 2012 run. Special emphasis will be placed on the key role of identification and rejection capabilities of the different sub-detectors of ATLAS and the algorithms used. …”
    Enlace del recurso
  8. 12908
    por Shamim, M
    Publicado 2012
    “…This contribution will summarize the status and performance of the ATLAS tau trigger system during the 2011 data taking period, and the upgrades put in place for the current 2012 run. Special emphasis will be placed on the key role of identification and rejection capabilities of the different sub-detectors of ATLAS and the algorithms used. …”
    Enlace del recurso
  9. 12909
    “…In the framework of the HIE-ISOLDE project, the REX linac will be upgraded in stages to 5.5 MeV/u and 10 MeV/u using superconducting (SC) quarter-wave cavities. …”
    Enlace del recurso
  10. 12910
    por Shamim, M
    Publicado 2012
    “…This contribution will summarize the status and performance of the ATLAS tau trigger system during the 2011 data taking period, and the upgrades put in place for the current 2012 run. Special emphasis will be placed on the key role of identification and rejection capabilities of the different sub-detectors of ATLAS and the algorithms used. …”
    Enlace del recurso
  11. 12911
    por Boisvert, V
    Publicado 2012
    “…The Large Hadron Collider will be upgraded in order to reach an instantaneous luminosity of $L=5 \times 10^{34}$ cm$^{-2}$ s$^{-1}$. …”
    Enlace del recurso
  12. 12912
    por Pesaro, Giulia
    Publicado 2011
    “…Particle Identication (PID) is performed with a Ring Imaging CHerenkov detector (RICH) that has been upgraded in 2005. COMPASS took data using transversely polarised $^{6}$LiD target from 2002 to 2004 and with a transversely polarised NH$_{3}$ target in 2007. …”
    Enlace del recurso
    Enlace del recurso
  13. 12913
    por Wanzenberg, R, Zagorodnova, O
    Publicado 2013
    “…The new machine configuration will also include an upgraded detector configuration and a new beam pipe in the CMS detector. …”
    Enlace del recurso
  14. 12914
    por Cattai, Ariella
    Publicado 2013
    “…This overview addresses the challenges that upgrades and future projects in HEP will impose in terms of novel technologies and stresses the detectors' potential and limitations in attempting to achieve the scientific goals. …”
    Enlace del recurso
    Enlace del recurso
  15. 12915
    por Butti, Pierfrancesco
    Publicado 2014
    “…For the LHC Run II, the Pixel Detector has been refurbished and upgraded with the installation of a new pixel layer, the Insertable B-layer (IBL).…”
    Enlace del recurso
    Enlace del recurso
  16. 12916
    por Höfle, W, Valuch, D
    Publicado 2012
    “…The ADT also provides bunch - by - bunch observation, which was extensively used during the run and MDs, and will be further upgraded during the next year.…”
    Enlace del recurso
  17. 12917
    por Sanchez, Arturo
    Publicado 2015
    “…Preliminary but satisfactory results have been obtained online; this presentation describes the tests and plans and future upgrades.…”
    Enlace del recurso
  18. 12918
    por Billen, Ronny
    Publicado 2013
    “…Inside this issue: Editorial – Ronny Billen New Isolde Synoptic project – Martino Giordano Ferrari, BE-OP-PSB, Emiliano Piselli, BE-BI-BL Nivellement rapide dans le LHC – Jean-Frédéric Fuchs, BE-ABP-SU, Dominique Missiaen, BE-ABP-SU The Software Improvement Process– Tools and Rules to Encourage Quality –Katarina Sigerud, BE-CO-DA, Vito Baggiolini, BE-CO-DO Emitance Mètre pour le Linac4 à partir de 3 MeV – Delphine Gérard, BE-BI-ML Superconducting RF and Infrastructure Upgrading at CERN – Karl Schirm, BE-RF-SRF Identification des risques à mon poste de travail – Analyse de risques – BE Safety Unit Stress and back pains: who can escape? …”
    Enlace del recurso
  19. 12919
    por Amendola, Chiara
    Publicado 2017
    “…A new Level-1 trigger architecture with improved performance is now being used to maintain the thresholds that were used in LHC Run I for the more challenging luminosity conditions experienced during Run II. The upgrades to the calorimetry trigger will be described along with performance data. …”
    Enlace del recurso
    Enlace del recurso
  20. 12920
    por Dordevic, Milos
    Publicado 2018
    “…The concept and performance of the Particle Flow algorithm, together with the prospects for its development in the context of the upgraded CMS detector, are presented in this overview.…”
    Enlace del recurso
Herramientas de búsqueda: RSS