Mostrando 1,741 - 1,760 Resultados de 16,611 Para Buscar '"Upgrade"', tiempo de consulta: 2.20s Limitar resultados
  1. 1741
    “…Finally the requirements and the options to upgrade both extraction protection elements in the SPS are described.…”
    Enlace del recurso
    info:eu-repo/semantics/article
  2. 1742
    por Tang, Fukun
    Publicado 2017
    “…Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies are being employed to determine which option will be selected. …”
    Enlace del recurso
  3. 1743
  4. 1744
    por Jakoubek, Tomas
    Publicado 2017
    “…The increased sensitivity is related mainly to the improved decay time resolution obtained with the upgraded ITk inner tracking detector.…”
    Enlace del recurso
  5. 1745
  6. 1746
    por Dudder, Andreas Christian
    Publicado 2017
    “…It is reported on the construction and test of large scale resistive Micromegas detectors for the ATLAS New Small Wheel upgrade. The production procedure of the 2 to 3 m2 active area is described. …”
    Enlace del recurso
    Enlace del recurso
  7. 1747
    por Tang, Fukun
    Publicado 2017
    “…Three different options are presently being investigated for the front-end electronic upgrade. Extensive test beam studies are being employed to determine which option will be selected. …”
    Enlace del recurso
    Enlace del recurso
  8. 1748
    por Ishino, Masaya
    Publicado 2017
    “…ATLAS detector performance in Run2, upgrade plans in LS2 and LS3 are reviewed…”
    Enlace del recurso
  9. 1749
  10. 1750
  11. 1751
    por Vormwald, Benedikt Roland
    Publicado 2017
    “…The Phase-1 upgrade of the CMS pixel detector is built out of four barrel layers (BPIX) and three forward disks in each endcap (FPIX). …”
    Enlace del recurso
    Enlace del recurso
  12. 1752
    por Bernius, Catrin
    Publicado 2017
    “…Title: The ATLAS Trigger algorithms upgrade and performance in Run 2 (TDAQ) The ATLAS trigger has been used very successfully for the online event selection during the first part of the second LHC run (Run-2) in 2015/16 at a center-of-mass energy of 13 TeV. …”
    Enlace del recurso
  13. 1753
  14. 1754
    por Lalanne, Louis-Alexandre
    Publicado 2017
    “…In order to increase the readout frequency from 1MHz to 40MHz RICH detectors will be upgrade in 2020. Prototypes are designed and tested by the RICH upgrade group of CERN. …”
    Enlace del recurso
  15. 1755
    por Sellapillay, Kevissen
    Publicado 2017
    “…The first part of the internship is focused on trying to assess the performance of the upgraded geometry of the ATLAS Tile Calorimeter. To do this, we use Monte Carlo generated samples for the upgraded geometry and from the current geometry, then we derive the pT response and resolution. …”
    Enlace del recurso
  16. 1756
    por Jakoubek, Tomas
    Publicado 2017
    “…The increased sensitivity is expected mainly due to the improved decay time resolution obtained with the upgraded IBL and ITk inner tracking detector.…”
    Enlace del recurso
    Enlace del recurso
  17. 1757
    por Weber, Hannsjorg Artur
    Publicado 2017
    “…For this reason the CMS collaboration has installed a replacement pixel detector during the recent extended end of year shutdown. The phase-1 upgrade of the CMS pixel detector will operate at high efficiency at an instantaneous luminosity of $2\times10^{34}\,\text{cm}^{-2}\text{s}^{-1}$ with increased detector acceptance and additional redundancy for the tracking, while at the same time reducing the material budget. …”
    Enlace del recurso
    Enlace del recurso
  18. 1758
  19. 1759
  20. 1760
Herramientas de búsqueda: RSS