Preliminary Characterization of the O4+ Beam in Linac 3

The new GTS-LHC ECR ion source was installed in 2005. An oxygen 4+ beam was delivered to LEIR both for injection line (June 2005) and for the ring commissioning (September to December 2005). During these runs, studies were made of the beam transport in the Linac and towards LEIR. Some of the most si...