Cargando…

Test Station for a 30 m long Superconducting Link

The Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6 kA and 600 A. For validation of the longest link a test station was desig...

Descripción completa

Detalles Bibliográficos
Autores principales: Benda, V, Davison, C, Goiffon, T, Van Weelderen, R, Roveta, G
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1026927