Cargando…
Test Station for a 30 m long Superconducting Link
The Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6Â kA and 600 A. For validation of the longest link a test station was desig...
Autores principales: | , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1026927 |
_version_ | 1780912231554220032 |
---|---|
author | Benda, V Davison, C Goiffon, T Van Weelderen, R Roveta, G |
author_facet | Benda, V Davison, C Goiffon, T Van Weelderen, R Roveta, G |
author_sort | Benda, V |
collection | CERN |
description | The Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6Â kA and 600 A. For validation of the longest link a test station was designed which is presently under construction. The design will permit the test station to be adapted for other links and/or cables as well. It will operate either in pool boiling mode, in order to measure thermal loads, or in forced super-critical helium flow mode to simulate real operation. Inlet pressure is 1.2 bar to 3 bar. Inlet temperature is adjustable from 4.4 K up to about 20 K. The station is being prepared to validate the LHC model link, consisting of 48 superconducting cables, each operating at 600 A between 4.5 K and 5.4 K. This article describes features of the equipment. |
id | cern-1026927 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10269272023-05-31T13:22:22Zhttp://cds.cern.ch/record/1026927engBenda, VDavison, CGoiffon, TVan Weelderen, RRoveta, GTest Station for a 30 m long Superconducting LinkAccelerators and Storage RingsThe Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6Â kA and 600 A. For validation of the longest link a test station was designed which is presently under construction. The design will permit the test station to be adapted for other links and/or cables as well. It will operate either in pool boiling mode, in order to measure thermal loads, or in forced super-critical helium flow mode to simulate real operation. Inlet pressure is 1.2 bar to 3 bar. Inlet temperature is adjustable from 4.4 K up to about 20 K. The station is being prepared to validate the LHC model link, consisting of 48 superconducting cables, each operating at 600 A between 4.5 K and 5.4 K. This article describes features of the equipment.LHC-PROJECT-Report-989CERN-LHC-PROJECT-Report-989oai:cds.cern.ch:10269272007-02-13 |
spellingShingle | Accelerators and Storage Rings Benda, V Davison, C Goiffon, T Van Weelderen, R Roveta, G Test Station for a 30 m long Superconducting Link |
title | Test Station for a 30 m long Superconducting Link |
title_full | Test Station for a 30 m long Superconducting Link |
title_fullStr | Test Station for a 30 m long Superconducting Link |
title_full_unstemmed | Test Station for a 30 m long Superconducting Link |
title_short | Test Station for a 30 m long Superconducting Link |
title_sort | test station for a 30 m long superconducting link |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1026927 |
work_keys_str_mv | AT bendav teststationfora30mlongsuperconductinglink AT davisonc teststationfora30mlongsuperconductinglink AT goiffont teststationfora30mlongsuperconductinglink AT vanweelderenr teststationfora30mlongsuperconductinglink AT rovetag teststationfora30mlongsuperconductinglink |