Test Station for a 30 m long Superconducting Link

The Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6 kA and 600 A. For validation of the longest link a test station was desig...

Descripción completa

Detalles Bibliográficos
Autores principales: Benda, V, Davison, C, Goiffon, T, Van Weelderen, R, Roveta, G
Lenguaje:eng
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1026927
_version_ 1780912231554220032
author Benda, V
Davison, C
Goiffon, T
Van Weelderen, R
Roveta, G
author_facet Benda, V
Davison, C
Goiffon, T
Van Weelderen, R
Roveta, G
author_sort Benda, V
collection CERN
description The Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6 kA and 600 A. For validation of the longest link a test station was designed which is presently under construction. The design will permit the test station to be adapted for other links and/or cables as well. It will operate either in pool boiling mode, in order to measure thermal loads, or in forced super-critical helium flow mode to simulate real operation. Inlet pressure is 1.2 bar to 3 bar. Inlet temperature is adjustable from 4.4 K up to about 20 K. The station is being prepared to validate the LHC model link, consisting of 48 superconducting cables, each operating at 600 A between 4.5 K and 5.4 K. This article describes features of the equipment.
id cern-1026927
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
record_format invenio
spelling cern-10269272023-05-31T13:22:22Zhttp://cds.cern.ch/record/1026927engBenda, VDavison, CGoiffon, TVan Weelderen, RRoveta, GTest Station for a 30 m long Superconducting LinkAccelerators and Storage RingsThe Large Hadron Collider (LHC) requires distribution of high electrical currents in the limited space of LHC tunnel. Four superconducting links of about 76 m length and one of 510 m will be installed in the tunnel to carry 6 kA and 600 A. For validation of the longest link a test station was designed which is presently under construction. The design will permit the test station to be adapted for other links and/or cables as well. It will operate either in pool boiling mode, in order to measure thermal loads, or in forced super-critical helium flow mode to simulate real operation. Inlet pressure is 1.2 bar to 3 bar. Inlet temperature is adjustable from 4.4 K up to about 20 K. The station is being prepared to validate the LHC model link, consisting of 48 superconducting cables, each operating at 600 A between 4.5 K and 5.4 K. This article describes features of the equipment.LHC-PROJECT-Report-989CERN-LHC-PROJECT-Report-989oai:cds.cern.ch:10269272007-02-13
spellingShingle Accelerators and Storage Rings
Benda, V
Davison, C
Goiffon, T
Van Weelderen, R
Roveta, G
Test Station for a 30 m long Superconducting Link
title Test Station for a 30 m long Superconducting Link
title_full Test Station for a 30 m long Superconducting Link
title_fullStr Test Station for a 30 m long Superconducting Link
title_full_unstemmed Test Station for a 30 m long Superconducting Link
title_short Test Station for a 30 m long Superconducting Link
title_sort test station for a 30 m long superconducting link
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1026927
work_keys_str_mv AT bendav teststationfora30mlongsuperconductinglink
AT davisonc teststationfora30mlongsuperconductinglink
AT goiffont teststationfora30mlongsuperconductinglink
AT vanweelderenr teststationfora30mlongsuperconductinglink
AT rovetag teststationfora30mlongsuperconductinglink