Cargando…

The LHC machine status, calibration run and commissioning plans

The status of the ongoing LHC installation is reported with some attention given to the long straight sections around the experiments. An overview of the proposed commissioning schedule for 2007 and 2008 presented. This schedule includes a calibration run at the end of 2007 which aims to deliver col...

Descripción completa

Detalles Bibliográficos
Autor principal: Lamont, Mike
Lenguaje:eng
Publicado: CERN 2007
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2007-001.15
http://cds.cern.ch/record/1027405