The LHC machine status, calibration run and commissioning plans

The status of the ongoing LHC installation is reported with some attention given to the long straight sections around the experiments. An overview of the proposed commissioning schedule for 2007 and 2008 presented. This schedule includes a calibration run at the end of 2007 which aims to deliver col...

Descripción completa

Detalles Bibliográficos
Autor principal: Lamont, Mike
Lenguaje:eng
Publicado: CERN 2007
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2007-001.15
http://cds.cern.ch/record/1027405
_version_ 1780912265403301888
author Lamont, Mike
author_facet Lamont, Mike
author_sort Lamont, Mike
collection CERN
description The status of the ongoing LHC installation is reported with some attention given to the long straight sections around the experiments. An overview of the proposed commissioning schedule for 2007 and 2008 presented. This schedule includes a calibration run at the end of 2007 which aims to deliver collisions at 450 GeV beam energy. The details of this run and planned beam conditions are summarised. The full commissioning to 7 TeV will be a challenging exercise and an overview of the plans for 2008 is given. Finally, the beam related issues associated with the LHC upgrade are briefly introduced.
id cern-1027405
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2007
publisher CERN
record_format invenio
spelling cern-10274052019-09-30T06:29:59Zdoi:10.5170/CERN-2007-001.15http://cds.cern.ch/record/1027405engLamont, MikeThe LHC machine status, calibration run and commissioning plansAccelerators and Storage RingsThe status of the ongoing LHC installation is reported with some attention given to the long straight sections around the experiments. An overview of the proposed commissioning schedule for 2007 and 2008 presented. This schedule includes a calibration run at the end of 2007 which aims to deliver collisions at 450 GeV beam energy. The details of this run and planned beam conditions are summarised. The full commissioning to 7 TeV will be a challenging exercise and an overview of the plans for 2008 is given. Finally, the beam related issues associated with the LHC upgrade are briefly introduced.CERNoai:cds.cern.ch:10274052007
spellingShingle Accelerators and Storage Rings
Lamont, Mike
The LHC machine status, calibration run and commissioning plans
title The LHC machine status, calibration run and commissioning plans
title_full The LHC machine status, calibration run and commissioning plans
title_fullStr The LHC machine status, calibration run and commissioning plans
title_full_unstemmed The LHC machine status, calibration run and commissioning plans
title_short The LHC machine status, calibration run and commissioning plans
title_sort lhc machine status, calibration run and commissioning plans
topic Accelerators and Storage Rings
url https://dx.doi.org/10.5170/CERN-2007-001.15
http://cds.cern.ch/record/1027405
work_keys_str_mv AT lamontmike thelhcmachinestatuscalibrationrunandcommissioningplans
AT lamontmike lhcmachinestatuscalibrationrunandcommissioningplans