Cargando…
The LHC machine status, calibration run and commissioning plans
The status of the ongoing LHC installation is reported with some attention given to the long straight sections around the experiments. An overview of the proposed commissioning schedule for 2007 and 2008 presented. This schedule includes a calibration run at the end of 2007 which aims to deliver col...
Autor principal: | Lamont, Mike |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2007-001.15 http://cds.cern.ch/record/1027405 |
Ejemplares similares
-
Status and commissioning plans for LHC Run 2. The RF system.
por: Baudrenghien, P, et al.
Publicado: (2014) -
Status of the LHC and commissioning plans
por: Burkhardt, Helmut
Publicado: (2010) -
Commissioning and the Initial Operation of the LHC
por: Lamont, Mike
Publicado: (2023) -
The LHC status: commissioning plans and interface with the experiments
por: Macina, Daniela
Publicado: (2007) -
2010 commissioning plans
por: Lamont, M
Publicado: (2010)