Cargando…

Installation of the LN2 tank in its final position.

The liquid nitrogen tank has been transferred from the test position near SHL55 to a position near the PM54 shaft in order to reduce the length of the transfer line from the tank to the cold box.

Detalles Bibliográficos
Autor principal: G. Perinic
Publicado: 2007
Materias:
Acceso en línea:http://cds.cern.ch/record/1034457