Cargando…
Installation of the LN2 tank in its final position.
The liquid nitrogen tank has been transferred from the test position near SHL55 to a position near the PM54 shaft in order to reduce the length of the transfer line from the tank to the cold box.
Autor principal: | |
---|---|
Publicado: |
2007
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1034457 |
_version_ | 1780912413814554624 |
---|---|
author | G. Perinic |
author_facet | G. Perinic |
author_sort | G. Perinic |
collection | CERN |
description | The liquid nitrogen tank has been transferred from the test position near SHL55 to a position near the PM54 shaft in order to reduce the length of the transfer line from the tank to the cold box. |
id | cern-1034457 |
institution | Organización Europea para la Investigación Nuclear |
publishDate | 2007 |
record_format | invenio |
spelling | cern-10344572019-09-30T06:29:59Zhttp://cds.cern.ch/record/1034457G. PerinicInstallation of the LN2 tank in its final position.MagnetThe liquid nitrogen tank has been transferred from the test position near SHL55 to a position near the PM54 shaft in order to reduce the length of the transfer line from the tank to the cold box.CMS-PHO-MAGNET-2007-004oai:cds.cern.ch:10344572007-04-16 |
spellingShingle | Magnet G. Perinic Installation of the LN2 tank in its final position. |
title | Installation of the LN2 tank in its final position. |
title_full | Installation of the LN2 tank in its final position. |
title_fullStr | Installation of the LN2 tank in its final position. |
title_full_unstemmed | Installation of the LN2 tank in its final position. |
title_short | Installation of the LN2 tank in its final position. |
title_sort | installation of the ln2 tank in its final position. |
topic | Magnet |
url | http://cds.cern.ch/record/1034457 |
work_keys_str_mv | AT gperinic installationoftheln2tankinitsfinalposition |