Cargando…
The First Result of Global Commissioning of the ATLAS Endcap Muon Trigger System in ATLAS Cavern
We report on the ATLAS commissioning run from the view point of the Thin Gap Chamber (TGC), which is the ATLAS end cap muon trigger detector. All the TGC sectors with on-detector electronics are going to be installed to the ATLAS cavern by the end of September 2007. To integrate all sub-detectors be...
Autores principales: | , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
CERN
2007
|
Materias: | |
Acceso en línea: | https://dx.doi.org/10.5170/CERN-2007-007.199 http://cds.cern.ch/record/1089267 |