Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the nee...
Autores principales: | , , , , , , , , , , , |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1123694 |
_version_ | 1780914650528874496 |
---|---|
author | Uythoven, J Arduini, Gianluigi Assmann, Ralph Wolfgang Gilbert, N Goddard, B Kain, V Koschik, A Kramer, T Lamont, M Mertens, V Redaelli, R Wenninger, J |
author_facet | Uythoven, J Arduini, Gianluigi Assmann, Ralph Wolfgang Gilbert, N Goddard, B Kain, V Koschik, A Kramer, T Lamont, M Mertens, V Redaelli, R Wenninger, J |
author_sort | Uythoven, J |
collection | CERN |
description | The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the need of any beam threading. This paper gives an overview of the hardware commissioning period and the actual beam tests carried out. It summarises the results of the beam test optics measurements and the performance of the installed hardware. |
id | cern-1123694 |
institution | Organización Europea para la Investigación Nuclear |
language | eng |
publishDate | 2008 |
record_format | invenio |
spelling | cern-11236942023-05-31T13:23:25Zhttp://cds.cern.ch/record/1123694engUythoven, JArduini, GianluigiAssmann, Ralph WolfgangGilbert, NGoddard, BKain, VKoschik, AKramer, TLamont, MMertens, VRedaelli, RWenninger, JBeam Commissioning of the SPS-to-LHC Transfer Line TI 2Accelerators and Storage RingsThe transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the need of any beam threading. This paper gives an overview of the hardware commissioning period and the actual beam tests carried out. It summarises the results of the beam test optics measurements and the performance of the installed hardware.LHC-PROJECT-Report-1119CERN-LHC-PROJECT-Report-1119oai:cds.cern.ch:11236942008-09-03 |
spellingShingle | Accelerators and Storage Rings Uythoven, J Arduini, Gianluigi Assmann, Ralph Wolfgang Gilbert, N Goddard, B Kain, V Koschik, A Kramer, T Lamont, M Mertens, V Redaelli, R Wenninger, J Beam Commissioning of the SPS-to-LHC Transfer Line TI 2 |
title | Beam Commissioning of the SPS-to-LHC Transfer Line TI 2 |
title_full | Beam Commissioning of the SPS-to-LHC Transfer Line TI 2 |
title_fullStr | Beam Commissioning of the SPS-to-LHC Transfer Line TI 2 |
title_full_unstemmed | Beam Commissioning of the SPS-to-LHC Transfer Line TI 2 |
title_short | Beam Commissioning of the SPS-to-LHC Transfer Line TI 2 |
title_sort | beam commissioning of the sps-to-lhc transfer line ti 2 |
topic | Accelerators and Storage Rings |
url | http://cds.cern.ch/record/1123694 |
work_keys_str_mv | AT uythovenj beamcommissioningofthespstolhctransferlineti2 AT arduinigianluigi beamcommissioningofthespstolhctransferlineti2 AT assmannralphwolfgang beamcommissioningofthespstolhctransferlineti2 AT gilbertn beamcommissioningofthespstolhctransferlineti2 AT goddardb beamcommissioningofthespstolhctransferlineti2 AT kainv beamcommissioningofthespstolhctransferlineti2 AT koschika beamcommissioningofthespstolhctransferlineti2 AT kramert beamcommissioningofthespstolhctransferlineti2 AT lamontm beamcommissioningofthespstolhctransferlineti2 AT mertensv beamcommissioningofthespstolhctransferlineti2 AT redaellir beamcommissioningofthespstolhctransferlineti2 AT wenningerj beamcommissioningofthespstolhctransferlineti2 |