Cargando…

Beam Commissioning of the SPS-to-LHC Transfer Line TI 2

The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the nee...

Descripción completa

Detalles Bibliográficos
Autores principales: Uythoven, J, Arduini, Gianluigi, Assmann, Ralph Wolfgang, Gilbert, N, Goddard, B, Kain, V, Koschik, A, Kramer, T, Lamont, M, Mertens, V, Redaelli, R, Wenninger, J
Lenguaje:eng
Publicado: 2008
Materias:
Acceso en línea:http://cds.cern.ch/record/1123694
_version_ 1780914650528874496
author Uythoven, J
Arduini, Gianluigi
Assmann, Ralph Wolfgang
Gilbert, N
Goddard, B
Kain, V
Koschik, A
Kramer, T
Lamont, M
Mertens, V
Redaelli, R
Wenninger, J
author_facet Uythoven, J
Arduini, Gianluigi
Assmann, Ralph Wolfgang
Gilbert, N
Goddard, B
Kain, V
Koschik, A
Kramer, T
Lamont, M
Mertens, V
Redaelli, R
Wenninger, J
author_sort Uythoven, J
collection CERN
description The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the need of any beam threading. This paper gives an overview of the hardware commissioning period and the actual beam tests carried out. It summarises the results of the beam test optics measurements and the performance of the installed hardware.
id cern-1123694
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2008
record_format invenio
spelling cern-11236942023-05-31T13:23:25Zhttp://cds.cern.ch/record/1123694engUythoven, JArduini, GianluigiAssmann, Ralph WolfgangGilbert, NGoddard, BKain, VKoschik, AKramer, TLamont, MMertens, VRedaelli, RWenninger, JBeam Commissioning of the SPS-to-LHC Transfer Line TI 2Accelerators and Storage RingsThe transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the need of any beam threading. This paper gives an overview of the hardware commissioning period and the actual beam tests carried out. It summarises the results of the beam test optics measurements and the performance of the installed hardware.LHC-PROJECT-Report-1119CERN-LHC-PROJECT-Report-1119oai:cds.cern.ch:11236942008-09-03
spellingShingle Accelerators and Storage Rings
Uythoven, J
Arduini, Gianluigi
Assmann, Ralph Wolfgang
Gilbert, N
Goddard, B
Kain, V
Koschik, A
Kramer, T
Lamont, M
Mertens, V
Redaelli, R
Wenninger, J
Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
title Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
title_full Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
title_fullStr Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
title_full_unstemmed Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
title_short Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
title_sort beam commissioning of the sps-to-lhc transfer line ti 2
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1123694
work_keys_str_mv AT uythovenj beamcommissioningofthespstolhctransferlineti2
AT arduinigianluigi beamcommissioningofthespstolhctransferlineti2
AT assmannralphwolfgang beamcommissioningofthespstolhctransferlineti2
AT gilbertn beamcommissioningofthespstolhctransferlineti2
AT goddardb beamcommissioningofthespstolhctransferlineti2
AT kainv beamcommissioningofthespstolhctransferlineti2
AT koschika beamcommissioningofthespstolhctransferlineti2
AT kramert beamcommissioningofthespstolhctransferlineti2
AT lamontm beamcommissioningofthespstolhctransferlineti2
AT mertensv beamcommissioningofthespstolhctransferlineti2
AT redaellir beamcommissioningofthespstolhctransferlineti2
AT wenningerj beamcommissioningofthespstolhctransferlineti2