Beam Commissioning of the SPS-to-LHC Transfer Line TI 2
The transfer line for the LHC Ring 1 was successfully commissioned with beam in the autumn of 2007. After extraction from the SPS accelerator and about 2.7 km of new transfer line, the beam arrived at the temporarily installed beam dump, about 50 m before the start of the LHC tunnel, without the nee...
Autores principales: | Uythoven, J, Arduini, Gianluigi, Assmann, Ralph Wolfgang, Gilbert, N, Goddard, B, Kain, V, Koschik, A, Kramer, T, Lamont, M, Mertens, V, Redaelli, R, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2008
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1123694 |
Ejemplares similares
-
Commissioning of the LHC Beam Transfer Line TI 8
por: Uythoven, Jan, et al.
Publicado: (2005) -
Optics Studies of the LHC Beam Transfer Line TI 8
por: Arduini, Gianluigi, et al.
Publicado: (2005) -
Beam Commissioning of the SPS LSS6 Extraction and TT60 for LHC
por: Balhan, B, et al.
Publicado: (2007) -
Machine studies during beam commissioning of the SPS-to-LHC transfer lines
por: Meddahi, M, et al.
Publicado: (2009) -
Beam commissioning of injection into the LHC
por: Mertens, V, et al.
Publicado: (2009)