Cargando…
Low intensity MTE beam in the SPS
In view of extracting fixed target type of beams for SPS fixed target physics or CNGS operation with the Multi-Turn-Extraction (MTE) scheme,an h = 16 MTE beam was produced in the CPS. The transmission and the longitudinal beam structure of this beam is compared with the beam extracted by CT.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1168013 |