Cargando…

Experience Gained From the Construction, Test and Operation of the Large 4-T CMS Coil

The 4-T, 6-m free bore CMS solenoid has been successfully tested, operated and mapped at CERN during the autumn of 2006; R&D studies started in 1993 and the construction proper in 1997. The main parameters of this 100 MUS$ project (including yoke) were then considered beyond what was thought pos...

Descripción completa

Detalles Bibliográficos
Autores principales: Hervé, A, Campi, D, Curé, B, Fabbricatore, P, Gaddi, A, Kircher, F, Sgobba, S