Cargando…
Reinstallation and interconnections
Reinstallation of the first magnets in the D-zone has already started in parallel with the removal of damaged magnets. It is planned for the last magnets to be reinstalled by end March. The start of interconnection (IC) work requires a minimum chain of adjacent magnets and their alignment: it is pla...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172394 |