Reinstallation and interconnections
Reinstallation of the first magnets in the D-zone has already started in parallel with the removal of damaged magnets. It is planned for the last magnets to be reinstalled by end March. The start of interconnection (IC) work requires a minimum chain of adjacent magnets and their alignment: it is pla...
Autor principal: | Bertinelli, F |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172394 |
Ejemplares similares
-
Other systems – what needs to be done?: Repair and reinstallation of other systems (standard QPS, PC, BLM, Cryo, Survey, …)
por: Solfaroli Camillocci, M, et al.
Publicado: (2009) -
The Interconnections of the LHC Cryomagnets at CERN: Strategy Applied and First Results of the Industrialization Process
por: Tock, J P, et al.
Publicado: (2008) -
Nondestructive Testing and Quality Control of the LHC Main Interconnection Splices
por: Heck, S, et al.
Publicado: (2015) -
The Quality Control of the LHC Continuous Cryostat Interconnections
por: Bertinelli, F, et al.
Publicado: (2008) -
Development of a New Insulation Approach for the LHC Main 13 kA Interconnection Splices
por: Lackner, F, et al.