Cargando…

Operational experience with circulating beam

Following various injection tests, the full LHC beam commissioning started on September 10th. Within three days of beam operation, we established stable and captured circulating beam 2 and achieved circulating beam 1 for many turns. This was made possible by a thorough preparations of all the requir...

Descripción completa

Detalles Bibliográficos
Autor principal: Redaelli, S
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172817
_version_ 1780916179141918720
author Redaelli, S
author_facet Redaelli, S
author_sort Redaelli, S
collection CERN
description Following various injection tests, the full LHC beam commissioning started on September 10th. Within three days of beam operation, we established stable and captured circulating beam 2 and achieved circulating beam 1 for many turns. This was made possible by a thorough preparations of all the required accelerator systems, beam instrumentation and control software, which all achieved a remarkable performance. First beam measurements of the linear machine optics were commissioned and showed that the machine optics is well under control. The operational experience with circulating beam, the performance of the various systems and the first measurement results are reviewed. The commissioning procedures for the various systems are presented and lessons learnt for the 2009 operation are discussed.
id cern-1172817
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728172019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172817engRedaelli, SOperational experience with circulating beamAccelerators and Storage RingsFollowing various injection tests, the full LHC beam commissioning started on September 10th. Within three days of beam operation, we established stable and captured circulating beam 2 and achieved circulating beam 1 for many turns. This was made possible by a thorough preparations of all the required accelerator systems, beam instrumentation and control software, which all achieved a remarkable performance. First beam measurements of the linear machine optics were commissioned and showed that the machine optics is well under control. The operational experience with circulating beam, the performance of the various systems and the first measurement results are reviewed. The commissioning procedures for the various systems are presented and lessons learnt for the 2009 operation are discussed.oai:cds.cern.ch:11728172009
spellingShingle Accelerators and Storage Rings
Redaelli, S
Operational experience with circulating beam
title Operational experience with circulating beam
title_full Operational experience with circulating beam
title_fullStr Operational experience with circulating beam
title_full_unstemmed Operational experience with circulating beam
title_short Operational experience with circulating beam
title_sort operational experience with circulating beam
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172817
work_keys_str_mv AT redaellis operationalexperiencewithcirculatingbeam