Operational experience with circulating beam
Following various injection tests, the full LHC beam commissioning started on September 10th. Within three days of beam operation, we established stable and captured circulating beam 2 and achieved circulating beam 1 for many turns. This was made possible by a thorough preparations of all the requir...
Autor principal: | Redaelli, S |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172817 |
Ejemplares similares
-
Operational Experience with First Circulating Beam in the LHC
por: Lamont, M, et al.
Publicado: (2009) -
Operational experience during initial beam commissioning of the LHC
por: Fuchsberger, K, et al.
Publicado: (2010) -
Are we ready for the 2009 beam operation?
por: Redaelli, S, et al.
Publicado: (2009) -
Operational Experience with Resonantly Extracted Beams
por: Jacobs, K D, et al.
Publicado: (2001) -
Operational experience of beam stability control
por: Steerenberg, R
Publicado: (2020)