Cargando…
Controls and software
A large number of components of the LHC controls infrastructure have been intensively exercised during several dry runs and the injection synchronization tests in 2008, in preparation for the LHC start up with beam. All the prior tests were extremely useful to validate the basic functionality, to id...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1172822 |