Cargando…

Controls and software

A large number of components of the LHC controls infrastructure have been intensively exercised during several dry runs and the injection synchronization tests in 2008, in preparation for the LHC start up with beam. All the prior tests were extremely useful to validate the basic functionality, to id...

Descripción completa

Detalles Bibliográficos
Autor principal: Hatziangeli, E
Lenguaje:eng
Publicado: 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1172822
_version_ 1780916180339392512
author Hatziangeli, E
author_facet Hatziangeli, E
author_sort Hatziangeli, E
collection CERN
description A large number of components of the LHC controls infrastructure have been intensively exercised during several dry runs and the injection synchronization tests in 2008, in preparation for the LHC start up with beam. All the prior tests were extremely useful to validate the basic functionality, to identify areas of weakness and to prepare the controls to a stable and well functioning infrastructure, which supported the successful LHC start up. This presentation will summarize the outcome of the controls commissioning with emphasis on major components like LSA, Timing synchronization, middleware, logging, and Role Based Access, the issues observed and the improvements to be implemented before the next LHC run in 2009.
id cern-1172822
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2009
record_format invenio
spelling cern-11728222019-09-30T06:29:59Zhttp://cds.cern.ch/record/1172822engHatziangeli, EControls and softwareAccelerators and Storage RingsA large number of components of the LHC controls infrastructure have been intensively exercised during several dry runs and the injection synchronization tests in 2008, in preparation for the LHC start up with beam. All the prior tests were extremely useful to validate the basic functionality, to identify areas of weakness and to prepare the controls to a stable and well functioning infrastructure, which supported the successful LHC start up. This presentation will summarize the outcome of the controls commissioning with emphasis on major components like LSA, Timing synchronization, middleware, logging, and Role Based Access, the issues observed and the improvements to be implemented before the next LHC run in 2009.oai:cds.cern.ch:11728222009
spellingShingle Accelerators and Storage Rings
Hatziangeli, E
Controls and software
title Controls and software
title_full Controls and software
title_fullStr Controls and software
title_full_unstemmed Controls and software
title_short Controls and software
title_sort controls and software
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1172822
work_keys_str_mv AT hatziangelie controlsandsoftware