Cargando…

Longitudinal Beam Dynamics Studies at CTF3 And Pulse Compressor Controlling

The aim of the CLIC Test Facility CTF3, built at CERN by an international collaboration, is to address the main feasibility issues of the CLIC electron-positron linear collider technology by 2010. One key-issue studied at CTF3 is the generation of the very high current drive beam, used in CLIC as th...

Descripción completa

Detalles Bibliográficos
Autor principal: Shaker, S H
Lenguaje:eng
Publicado: IPM 2009
Materias:
Acceso en línea:http://cds.cern.ch/record/1176376