Cargando…
First Results for the Beam Commissioning of the CERN Multi-Turn Extraction
The Multi-Turn Extraction (MTE), a new type of extraction based on beam trapping inside stable islands in horizontal phase space, has been commissioned during the 2008 run of the CERN Proton Synchrotron. Both singleand multi-bunch beams with a total intensity up to 1.4 1013 protons have been extract...
Autores principales: | Gilardoni, S, Arnold Malandain, F, Benedetto, E, Bohl, T, Cettour Cave, S, Cornelis, K, Damerau, H, Follin, F, Fowler, T, Franchi, A, Freyermuth, P, Genoud, H, Giachino, R, Giovannozzi, M, hancock, S, Le Borgne, Y, Manglunki, D, Métral, G, Pereira, L, Ridewood, J, Riva, Y, Schokker, M, Sermeus, L, Steerenberg, R, Vandorpe, B, Wenninger, J |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1208358 |
Ejemplares similares
-
Results from the 2009 beam commissioning of the CERN multi-turn extraction
por: Benedetto, E, et al.
Publicado: (2010) -
Ions for LHC: performance of the injector chain
por: Manglunki, D, et al.
Publicado: (2011) -
Working Point and Resonance Studies at the CERN PS
por: Huschauer, A, et al.
Publicado: (2013) -
Performance reach of the injector complex in 2012
por: Steerenberg, R, et al.
Publicado: (2012) -
CERN Proton Synchrotronworking point Matrix for extended pole face winding powering scheme
por: Freyermuth, P, et al.
Publicado: (2010)