Cargando…
Summary of QRL 7-8 Repair and Re-installation Leak Test Results
This note describes the leak tests that have been performed during the repair and re-installation of QRL sector 7-8 during 2005 and 2006. The leak tests were performed in UX65, where the pipe elements were refurbished before re-installation, and in the tunnel. A variety of leaks have been detected,...
Autores principales: | , |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1234930 |