Summary of QRL 7-8 Repair and Re-installation Leak Test Results
This note describes the leak tests that have been performed during the repair and re-installation of QRL sector 7-8 during 2005 and 2006. The leak tests were performed in UX65, where the pipe elements were refurbished before re-installation, and in the tunnel. A variety of leaks have been detected,...
Autores principales: | Kos, N, Coly, P |
---|---|
Lenguaje: | eng |
Publicado: |
2009
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1234930 |
Ejemplares similares
-
QRL Installation and first Experiences of Operation
por: Riddone, G
Publicado: (2006) -
How to deal with leaks in the QRL and magnet insulations vaccum
por: Cruikshank, P
Publicado: (2005) -
Adjudication of a contract for the assembly, installation and leak testing of the SPS vacuum system
por: CERN. Geneva
Publicado: (1978) -
Proposal to negotiate an amendment to an existing contract for the installation of phase 2 of QRL sector 7-8
Publicado: (2005) -
Test QRL
por: Sandro Cataldi