Cargando…

Upgrade of the BOC for the ATLAS Pixel Insertable B-Layer

The phase 1 upgrade of the ATLAS [1] pixel detector will be done by inserting a fourth pixel layer together with a new beampipe into the recent three layer detector. This new detector, the Insertable B-Layer (IBL) should be integrated into the recent pixel system with as few changes in services as p...

Descripción completa

Detalles Bibliográficos
Autores principales: Dopke, J, Flick, T, Heima, T, Kugel, A, Mattig, P, Schroer, N, Zeitnitz, C
Lenguaje:eng
Publicado: CERN 2009
Materias:
Acceso en línea:https://dx.doi.org/10.5170/CERN-2009-006.404
http://cds.cern.ch/record/1235845