Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
LINAC4 is the first step in the upgrade of the injector chain for the LHC, and will accelerate H- ions from 45 keV to 160 MeV. Currently the ion source is installed in a test setup and its commissioning started at the end of 2009. A slit-grid system is used to measure the transverse emittance of the...