Commissioning of the LINAC4 Ion Source Transverse Emittance Meter

LINAC4 is the first step in the upgrade of the injector chain for the LHC, and will accelerate H- ions from 45 keV to 160 MeV. Currently the ion source is installed in a test setup and its commissioning started at the end of 2009. A slit-grid system is used to measure the transverse emittance of the...

Descripción completa

Detalles Bibliográficos
Autores principales: Bravin, E, Cheymol, B, Dutriat, C, Lokhovitsky, A, Raich, U, Roncarolo, F, Scrivens, R, Zorin, E
Lenguaje:eng
Publicado: 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1271728
_version_ 1780920229142986752
author Bravin, E
Cheymol, B
Dutriat, C
Lokhovitsky, A
Raich, U
Roncarolo, F
Scrivens, R
Zorin, E
author_facet Bravin, E
Cheymol, B
Dutriat, C
Lokhovitsky, A
Raich, U
Roncarolo, F
Scrivens, R
Zorin, E
author_sort Bravin, E
collection CERN
description LINAC4 is the first step in the upgrade of the injector chain for the LHC, and will accelerate H- ions from 45 keV to 160 MeV. Currently the ion source is installed in a test setup and its commissioning started at the end of 2009. A slit-grid system is used to measure the transverse emittance of the beam at the exit of the source. The results of the measurements have been compared with analytical and numerical predictions of the performance of the emittance meter, addressing the system resolution, accuracy and sensitivity. The outcome of this analysis has been used to improve the design of a new slit-grid system foreseen for the commissioning of LINAC 4 at higher energy locations.
id cern-1271728
institution Organización Europea para la Investigación Nuclear
language eng
publishDate 2010
record_format invenio
spelling cern-12717282022-08-17T13:26:53Zhttp://cds.cern.ch/record/1271728engBravin, ECheymol, BDutriat, CLokhovitsky, ARaich, URoncarolo, FScrivens, RZorin, ECommissioning of the LINAC4 Ion Source Transverse Emittance MeterAccelerators and Storage RingsLINAC4 is the first step in the upgrade of the injector chain for the LHC, and will accelerate H- ions from 45 keV to 160 MeV. Currently the ion source is installed in a test setup and its commissioning started at the end of 2009. A slit-grid system is used to measure the transverse emittance of the beam at the exit of the source. The results of the measurements have been compared with analytical and numerical predictions of the performance of the emittance meter, addressing the system resolution, accuracy and sensitivity. The outcome of this analysis has been used to improve the design of a new slit-grid system foreseen for the commissioning of LINAC 4 at higher energy locations.CERN-BE-2010-014CERN-ATS-2010-109oai:cds.cern.ch:12717282010-05-01
spellingShingle Accelerators and Storage Rings
Bravin, E
Cheymol, B
Dutriat, C
Lokhovitsky, A
Raich, U
Roncarolo, F
Scrivens, R
Zorin, E
Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
title Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
title_full Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
title_fullStr Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
title_full_unstemmed Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
title_short Commissioning of the LINAC4 Ion Source Transverse Emittance Meter
title_sort commissioning of the linac4 ion source transverse emittance meter
topic Accelerators and Storage Rings
url http://cds.cern.ch/record/1271728
work_keys_str_mv AT bravine commissioningofthelinac4ionsourcetransverseemittancemeter
AT cheymolb commissioningofthelinac4ionsourcetransverseemittancemeter
AT dutriatc commissioningofthelinac4ionsourcetransverseemittancemeter
AT lokhovitskya commissioningofthelinac4ionsourcetransverseemittancemeter
AT raichu commissioningofthelinac4ionsourcetransverseemittancemeter
AT roncarolof commissioningofthelinac4ionsourcetransverseemittancemeter
AT scrivensr commissioningofthelinac4ionsourcetransverseemittancemeter
AT zorine commissioningofthelinac4ionsourcetransverseemittancemeter