Upgrade on risk analysis following the 080919 incident in the LHC sector 3-4
On 19th September 2008, during powering tests of the main dipole circuit in sector 3-4 of the LHC, an electrical fault occurred producing an electrical arc and resulting in mechanical and electrical damage, release of about 6 tons of helium from the magnet cold mass to the insulation vacuum enclosur...