Cargando…
Upgrade on risk analysis following the 080919 incident in the LHC sector 3-4
On 19th September 2008, during powering tests of the main dipole circuit in sector 3-4 of the LHC, an electrical fault occurred producing an electrical arc and resulting in mechanical and electrical damage, release of about 6 tons of helium from the magnet cold mass to the insulation vacuum enclosur...
Autores principales: | Chorowski, M, Fydrych, J, Modlinski, Z, Polinski, J, Tavian, L, Wach, J |
---|---|
Lenguaje: | eng |
Publicado: |
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1277511 |
Ejemplares similares
-
Risk analysis update of the LHC cryogenic system following the 19th September 2008 incident
por: Chorowski, M, et al.
Publicado: (2011) -
Flow and Thermo-mechanical Analysis of the LHC Sector Helium Relief System
por: Chorowski, M, et al.
Publicado: (2004) -
Analysis of thermo-mechanical pipe-strength for the LHC helium relief system and corresponding helium flows following a resistive transition of the magnets.
por: Chorowski, M, et al.
Publicado: (2005) -
Experimental Validation of the LHC Helium Relief System Flow Modeling
por: Fydrych, J, et al.
Publicado: (2006) -
Summary of the Experimental Studies of Cold Helium Propagation along a scale model of the LHC Tunnel
por: Chorowski, M, et al.
Publicado: (2004)