Cargando…
Feasibility Study for High Power RF – Energy Recovery in Particle Accelerators
When dealing with particle accelerators, especially in systems with travelling wave structures and low beam loading, a substantial amount of RF power is dissipated in 50Ω termination loads. For the Super Proton Synchrotron (SPS) at Cern this is 69 % of the incident RF power or about 1 MW. Different...
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
Hochschule, Eng. Econ., Karlsruhe
2010
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1300172 |