Cargando…

Feasibility Study for High Power RF – Energy Recovery in Particle Accelerators

When dealing with particle accelerators, especially in systems with travelling wave structures and low beam loading, a substantial amount of RF power is dissipated in 50Ω termination loads. For the Super Proton Synchrotron (SPS) at Cern this is 69 % of the incident RF power or about 1 MW. Different...

Descripción completa

Detalles Bibliográficos
Autor principal: Betz, Michael
Lenguaje:eng
Publicado: Hochschule, Eng. Econ., Karlsruhe 2010
Materias:
Acceso en línea:http://cds.cern.ch/record/1300172

Ejemplares similares