Commissioning and optimization of the LHC BLM System

Due to rapid progress with the LHC commissioning in 2010, set-up beam intensities were soon surpassed and damage potential was reached. One of the key systems for machine protection is the beam loss monitoring (BLM) system. Around 4000 monitors are installed at likely or critical loss locations. Eac...