Cargando…
Power Overhead in the LINAC-4 Debuncher Cavity
The LINAC4 debuncher cavity is phase ramped and has to cope with a pulsed beam. We estimate here the required installed RF power.
Autor principal: | |
---|---|
Lenguaje: | eng |
Publicado: |
2011
|
Materias: | |
Acceso en línea: | http://cds.cern.ch/record/1344128 |